Salient Features

1.General
Name of the ProjectTamor Mewa Hydroelectric Project
Name of RiverTamor and Mewa
Type of Scheme Run-of-the-River (RoR)
DistrictTaplejung
Geographical Co-ordinates
Latitude27°20’00’’N, 27°24’08’’N
Longitude87°37’15’’E, 87°40’00’’E
Nearest Town Phungling
Access Road NameMechi Highway
2.Organization
DeveloperSpark Hydroelectric Company Limited
3.Hydrology
Catchment AreaTamor- 2062 km2
Mewa- 574 km2
Discharge (at 40%PoE) Tamor- 95.38 m3/s
Mewa- 34.18 m3/s
4.Sediment Study
Average annual Sediment load 9.41 Million Tons/year
5Geology
Regional Geology Lesser Himalaya, Taplejung window
Major Rock Types in Headworks Mewa: Augen Gneiss Tamor: schist,
phyllite, quartzite, Granatic Gneiss
Major Rock Type in WaterwaysMewa: Mica Schist, Tamor: schist, phyllite,
and quartzite intercalation
Major Rock Type in Powerhouse Granitic Gneiss
6.Structures
Dam/WeirTamor Scheme Mewa Scheme
TypeGated Barrage Concrete Overflow
Length85 m 45 m
Provision of stilling Basin Simple rectangular Simple rectangular
Diversion During Construction
Construction flood665 m3/s 390 m3/s
Diversion Type EmbankmentEmbankment
Sluicing
Number of bays Spillway Gate: 4
Undersluice Gate: 2
2
Dimension (B x H)Spillway: 10m x 7m

Undersluice: 10m x 12m
5m x 4m
Gate typeRadial Vertical Lift
Intake Structure
Type of Intake Submerged
Concrete orifice
Submerged
Concrete orifice
Nos of Opening 6 4
Size of Intake (B x H) 5m x 5m 4m x 2.5m
Gate TypeVertical Lift Gate Vertical Lift Gate
Hoisting SystemRope Drum HoistRope Drum Hoist
Trashrack size (B x H)5m x 5m4m x 2.5m
Clear opening of trash rack32 mm32 mm
Trash Cleaning MechanismTRCMManual
Gravel Trap
TypeRCC Rectangular
Number of Bays3
Gravel Trap Size (L x B x H, m)32 x 8 x 8
Size of Flushing Canal (B x H, m)2 x 2
Connecting Canal
Size (L x B x H, m)62 x 4 x 8
Desander
TypeDufourDufour
Particle Size to be settled0.2 mm0.5 mm
Settling Efficiency90 %90 %
Number of Bays31
Dimension (L x B x H, m)160 x 30 x 1280 x 16 x 5
Inlet Transition Length4515
Flushing systemIntermittentIntermittent
Size of flushing channel ( B x H, m)1 x 11 x 1
Headrace
TypeHeadrace TunnelSteel Headrace pipe and Headrace Tunnel
MaterialConcrete and shotcrete linedSteel Pipe and shotcrete lined
Length4.78 km306 m Pipe and 2616 m Tunnel
Dimension7m dia. HorseshoePipe: 3m dia. circular
Tunnel: 4.05m dia. inverted D
Surge Shaft
TypeRestricted orifice
Internal Diameter15 m
Height58m
Penstock /Pressure Shaft
TypeUndergroundSurface
MaterialSteel linedSteel pipe
Internal Diameter5.75m3.0m
Length155m120m
Steel Thickness20 - 36mm12mm
Powerhouse
TypeUnderground
Size (L x B x H,m )80 x 20 x 29
Overhead hoisting typeEOT Crane
Overhead hoist capacity140 Ton
Support typeShotcrete and rockbolt
Tailrace
TypeUnderground
Number1
Dimension7.6m dia. Horseshoe
Length270 m
7.Turbine
TypeVertical axis Francis
Number3
Rated Output Capacity per unit44.00 MW
Gross Head124.50 m
Discharge per Unit42 m3/s
Efficiency92%
8.Generator
TypeSynchronous
Synchronous Speed300 rpm
Rated Output Capacity per Unit50.30 MVA
Power Factor0.85 over-excited
Generation Voltage11 kV
Frequency50 Hz
No of Units3
Excitation SystemStatic with microprocessor based digital AVR
Efficiency97%
9.Transformer
TypeIndoor type single phase
Rated Capacity17 MVA each
Voltage Ratio220/√3/11kV
No of Units10 (including 1 spare)
Vector GroupYnd5 solidly earthed
Frequency50 Hz
Efficiency99%
10.Transmission Line
Voltage Level220 kV double circuit
Length6.3 km
Conductor Type2*BISON
FromPH switchyard
ToDhungesaghu Substation
11.Power and Energy
Design Discharge129.56 m3/s
Gross head124.5 m
Installed Capacity128 MW
Total Energy719.11 GWh